PRODUCTS

 

点击看大图

YZ(S) VERTICAL SLURRY PUMP (MAINTENANCE-FREE, HIGH
 
 

YZ(S) VERTICAL SLURRY PUMP (MAINTENANCE-FREE, HIGH TEMPERATURE RESISTANCE FOR 500℃)
I, Summarize
YZ(S) Slurry pump is the vertical cantilever centrifugal pump structure of single stage and single suction, the pump impeller is for semi-shrouded with the agitating vane on the vane extended.
Two series pumps are mainly used in the environmental protection, the municipal engineering, the thermal power plant, the aeroconcrete, the coal coking plant, the refinery, the steel mill, the mining, the paper making, the cement plant, the foodstuffs factory, the printing and dyeing industries to pump thick liquid, thick oil, dreggy liquid, slurry, mortar, drafting sand and sludge in urban sewage channel, as well as mud and sand residue liquid and corrosive liquid. YW can also pump every kind of discharging to use from the human and animal’s excrement sewage, the large and medium size methane pool and the methane projects. YZ(S) may also transport kerosene, crude oil, asphalt and oil residue at high temperature (500℃).
Model Meaning: eg.80YW80-20A
YW–Underwater multi-purpose sewage pump
80 – Pump outlet diameter (mm)
80–Pump design flow rate (m ³ / h)
20 –Pump design head (m)
A –Impeller first to be cut less
80-YZ80-20A
YZ (S) - Vertical slurry pump
80 – Pump outlet diameter (mm)
80–Pump design flow rate (m ³ / h)
20 –Pump design head (m)
A –Impeller first to be cut less
Pump's drive type: The pump is connecting through the flexible coupling and the electric motor, the pump direction of rotation is clockwise from the prime move.
II, Structure introduction
YZ (S) Pump is the cantilever pump structure of single stage and single suction, with the bearing housing, supporting, intermediate pipe connecting the pump hydraulic components, the water is discharged out from the drain pipe parts, pump impeller is for semi-shrouded with the agitating vane on the vane extended, the main characteristic of this pump is the underwater pump shaft parts have enough rigidity, the impeller and pump shell have no bearings, no shaft seal, which can transport the greater medium of solid particles. The length of inserting the water by pump is between 800 and 2000, the suction pipe can be matched in case of need. The shaft seal runs into the underwater pump without setting up the shaft seal, drive should be installed the vertical motor on the supporting seat connecting with coupling and pump.
 
 
1.前盖        Front cover
2.泵体        Pump body
3.叶轮        Impeller
4.泵盖        Pump cover
5.出水弯头    Outlet elbow
6.出水管      Outlet pipe
7.联接管      Intermediate pipe
8.固定盘      Fixed tray
9.轴承        Bearing
10.轴         Shaft
11.轴承体     Bearing body
12.轴承       Bearing
13.联轴器部件 Coupling parts
14.电机座    Motor cabinet
15.电机      Motor
 
YZ(S) Vertical slurry pump structure
 
AA– The lowest liquid level value
BB – The lowest liquid level value for start-up
D–  The suction pipe diameter
 
Figure 2  YZ(S) Vertical slurry pump structure chart 
 
 
 
〇 indicates standard point
● indicates the performance point after impeller cutting
Note: This chart is clean water performance     Flow rate Q
Head  H
 
Ⅴ、YZ(S) Vertical slurry pump performance table
Model
Flow rate
Head
(m)
Rotate speed
(r/min)
Efficiency(%)
Assembly Motor
m³/h
L/S
Model
(KW)
Power
 
, Assembling and disassembling
YZ Vertical pump assemble sequence
(1) To install the bearing separately on the bearing box and the bearing.
(2) To install the felt ring on the bearing end cover A and C and bearing box.
(3) To install the bearing end cover B and D on the bearing with screw to tighten.
(4)To install the bearing box on the shaft, to screw the round nut and the bearing end cover A is fastened on the bearing box.
(5) To case the shaft on the bearing housing with the screw to fix, to screw the adjusting screw, and to install the bearing housing on the supporting, to trap the water-resist ring on the appropriate position of lower bearing part.
(6) To fix the intermediate pipe on the bearing housing, to install the pump cover on the lower part of intermediate pipe, to install and tighten the impeller on the lower part of the bearing, in turn to install the pump body front cover and fixed with the screw and to adjust the gap between the adjusting screw and impeller and the front cover on the bearing box, after adjusting the nut (within 1-1.5mm), to tighten the screw.
(7) The electrical motor supporting installs on the bearing housing with the screw to tighten, the coupling parts should installed on the upper shaft, and the electrical motor coupling is fastened on the motor shaft head with the fastening screw, to install the motor on the motor supporting and to tighten with screw and nut.
 (8) To fix the asbestos cushion, the drain elbow, the drain pipe parts on the supporting on pump's exit sequence.
The pump's dis-assemblage should be carried on the opposite step above.
Ⅶ, Installation
1. The equipment work before installation.
a. To inspect whether the water pump and motor damaged
b. Preparation for tool and hoisting equipment
c. To inspect the foundation according to drawing.
2. To install the pump supporting base on the vessel and to tighten the screw (for example the cement well must establish foundation screw in advance).
Ⅷ, Start up and stop
1. To observe whether the pump installation foundation already to be stable and whether all the parts screw already to be tight.
2. To inspect whether the pump axis gap already to adjust well (pulled coupling not have fricative). 
3. Oil standard pours into the calcium base grease.
4. To inspect whether the electric motor rotation direction to be correct.
5. To start up the motor, to turn on the gauge meter, the gate valve should open the demand scope when the pump rotated entirely.
6. When pump stop working, it should stop the electric motor at first, then close the gauge meter.
7. The pump should stop running for a long term, should disassemble and clean the pump, wipe and preserve the antirust oil.
Ⅸ, Operation
1. Pay attention to the pump bearing temperature, which should not surpass the environment temperature with 35℃, but the highest temperature should be not bigger than 75℃.
2. The lubricate cap should fill up the calcium base grease to guarantee the bearing can lubricate normally.
3. The pump should replace the electric motor supporting in works in the first month or work for 100 hours later, to replace for working every 2000 hours.
4. Periodic inspection of the flexible coupling, pay attention to the electric motor bearing temperature to rise. 
5. In the running process, if to find the noise or unusual sound, which should stop the inspection immediately. 
6. The pump should make the periodic inspection for every 2000 hours, the gap wear between impeller and pump body (pump cover) can not be too large, the gap maximum value does not surpass 1.5 mm, can replace the impeller or the front cover if surpassed.
Ⅹ、Common faults and removal method
Common faults
Possible reason
Removal method
No water pumped, the pressure gauge pointer violent beating
 
1.      Inlet pipe siltation
2.      Pipe and instrumentation leakage
 
1. Remove the blockage
2.Block up the air leakage parts
No water pumped
1.Pump inlet higher than liquid level
2. Wrong rotating direction
1.Heighten the liquid level or descend the pump installation height 
2.Inspect motor swerve
Gauge indicates there are some pressure on the outlet, where still not pump the water
1.Outlet pipe resistance is large
2.Impeller siltation
3.Revolution deficiency
1.Inspect the pipe
2.Clean impeller
3.Add pump revolution
Flow rate over-lowing
1.Water pump siltation
2.Revolution deficiency
3.Serious wearing in impeller
1.Clean pump and pipe
2.Add the revolution
3.Change the impeller
The pump consumed power is oversized
1.Pump water supply is too small(or all closed)
2,Wearing in impeller
1,Outlet pipe open the gate valve
2.Change the impeller
Overheating in bearing
1,Bearing oil starvation
2,Bearing feculence or damage
1,Add lubrication
2,clean bearing or replace bearing